Skip to main content

White Plus solutions Obtaining CAR TEE on cogeneration plant

The customer is an important Italian company in the chemical sector.

Situation prior to intervention
The plant is characterized by a high consumption of electricity, due in part to the production of cool water by chiller.

Proposed solution and post-intervention situation
The intervention identified consists in the construction of a trigeneration plant. Following the intervention, the client company benefits from a substantial reduction in the cost of electricity, which is self-produced, as well as a reduction in consumption since the cooling energy is supplied by the absorber using the heat of the cogenerator. The TEEs provided following the intervention are around 3000 each year for ten years.